Structural Revit model quality check before issue

The checklist to run before every issue of a structural Revit model, and the part of the checking that can be automated.

By CaliBim 9 min read

An issued structural Revit model leaves the team that knows it. The architect links it, the MEP engineer looks in it for the openings they need, the contractor takes quantities from it: none of them knows that a wall was duplicated during rework or that a level has shifted. A pre-issue quality check is there to find this out before they do. It relies less on software than on a written checklist, run through every time. Here it is, section by section.

Setting the scope of the check

A model handed to the architect for coordination is not checked in the same way as a model handed to the contractor for quantity take-off. Three questions set the scope:

  • Who receives the model, and what for? Overlay and levels for the architect, openings and exchange formats for the MEP engineer, quantities and marks for the contractor, the analytical model for structural analysis.
  • What does the BIM execution plan require? Every written requirement (content expected at the stage, naming, parameters, delivery formats) becomes an item that can be checked.
  • Who does the checking? It is hard to review your own work: an outside eye, or at least a written checklist, catches what habit no longer notices.

The check ends with an issue note: version, date, content, known limitations and open points. The recipient then knows what not to rely on yet.

File health

A heavy or damaged file also penalises everyone who receives it as a link. Four actions cover the essentials:

  • Review the warnings (Manage > Inquiry > Warnings). Autodesk counts them, together with those in linked models, among the causes of slow file opening. In a structural model, some should always be dealt with: identical instances in the same place, counted twice in schedules; elements slightly off axis, which get in the way of dimensioning; overlapping elements; duplicate marks. The list can be exported, so that successive issues can be compared.
  • Audit the file on opening (the Audit option in the Open dialog): Revit repairs damaged elements, without saying which ones. Autodesk advises doing this every week; for a central model, when nobody is working in it.
  • Run Purge Unused (Manage > Settings) after making a backup and, in a workshared model, with all worksets open. Untick the types the team is keeping for later.
  • Compact the file when saving; for a central model, when synchronising (Compact Central Model), at least once a month.

Then there are the signs of a file that is getting heavier: in-place families, DWGs imported rather than linked, imported images. None of them is forbidden; each one needs a reason to be there.

Positioning: reference points, levels and grids

Set up at the start of the project, as detailed in our article on preparing Revit models for Navisworks, shared-coordinate positioning is checked again before every issue:

  • References always pinned: the Project Base Point and Survey Point, links, levels and grids.
  • Coordinates that match: a common control point, a grid intersection for example, read off in each model, must give the same shared coordinates in all of them.
  • Nothing stray far from the internal origin: Autodesk recommends keeping all geometry within 16 km of it. An isolated element far away shows up when you zoom the 3D view to fit the whole model.
  • Levels and grids under monitoring: copied from the architect's model with Copy/Monitor, they are tracked with Coordination Review (Collaborate > Coordinate). Before issue, no discrepancy is left without a decision, and postponed items are listed in the issue note.

Structural consistency

This section calls for an engineer's eye: a clean, correctly positioned model can still describe a structure that does not carry its loads. Schedules, view filters and a structure-only 3D view do most of the work:

  • Categories: Structural Columns rather than architectural Columns, Structural Framing, Structural Foundations, Walls and Floors. A beam modelled in the Generic Models category is missed by framing schedules and filters, and by analytical automation too.
  • Walls set as structural: drawn with the architectural wall tool, a wall is by default neither structural nor load-bearing, so it is missing from schedules filtered on the structure. A wall schedule sorted by Structural Usage reveals it straight away.
  • Materials: a structural material on every column and every beam, to be checked element by element when the family sets it per instance, and a structural layer in every wall and floor assembly. A material takeoff brings out any omissions.
  • Supports: once its levels and offsets have been checked, every column rests on a load-bearing element (column, beam, wall, footing or raft), and every beam bears on columns, walls or other beams. A section box lowered storey by storey shows what is resting on nothing.
  • Joined geometry (Modify > Geometry > Join): at column-beam-slab junctions, a missing join counts the shared concrete twice, and the join order decides which schedule it is assigned to.
  • Duplicates: beyond the warning, an interference check of the structure against itself reveals partial overlaps, such as a column running through several storeys duplicated by storey-height columns.

If the model is used for analysis, the analytical model, which since Revit 2023 no longer automatically follows the physical model, is checked separately, as explained in our article on the exchange between Revit and Robot.

Data: parameters, naming and quantities

The people who receive the model query it through its data, with a filter, a schedule or a search set in Navisworks. Data that is missing or wrongly named slips past them, with nothing to flag it. What to check:

  • Project Information (Manage > Settings), which feeds the title block.
  • The file name, following the fields and order set by the BIM execution plan: ISO 19650 requires an agreed rule but does not set its content.
  • Type names that match the tags on the drawings: a 30×60 beam is called exactly that, not “Beam 2”.
  • Required parameters filled in (classification, zone, work package), taken from a single shared parameters file.
  • Unique marks, which Revit flags when duplicated but does not prevent.
  • Quantities, compared with the previous issue: a difference that the changes made since then do not explain deserves a question.

A check schedule and a view filter that colours elements with an empty required parameter are enough for most of these checks; set up in the template, they can be reused at every issue.

What goes with the model matters as much as the model itself:

  • Views and sheets: view templates applied, working views removed, revisions up to date, a lightweight starting view.
  • Links: the Manage Links dialog shows the status of each one and its path type, preferably relative. The DWGs used for modelling are removed.
  • Worksharing: synchronise with central, relinquish borrowed elements, then produce the issued copy by opening the file with Detach from Central, preserving or discarding its worksets (discarding them is permanent).
  • Associated files: eTransmit, an Autodesk add-in for Revit, copies the model with its links and external files and updates the paths for the copy; it is used with the models closed.
  • Interferences with linked models: Revit's Interference Check (Collaborate > Coordinate) gives a first report, which can be exported to HTML; detailed steel elements and MEP fabrication parts, which it ignores, as well as more refined tests, call for Navisworks.
  • IFC export: a saved setup that stays the same from one issue to the next, a checked mapping between categories and IFC classes (a wrongly mapped category changes class, or even disappears from the file), and the property sets required by the BIM execution plan. Autodesk's IFC exporter is updated independently of Revit: its version goes in the issue note.
  • NWC export, with Autodesk's free NWC export utility and options that stay the same.

Every file produced is reopened before it is sent: the copy in Revit, the IFC linked into Revit or opened in Navisworks.

Automating repetitive checks

A checklist run by hand ends up being cut short. Whatever can be described by a rule can be handed to a tool; judgement stays with the human reviewer:

  • Model Checker for Revit, an Autodesk add-in, checks the model against a rule set prepared with its configuration tool and produces a compliance report.
  • Dynamo and Dynamo Player, for your office's own checks, which the whole team can run with a single click.
  • The Revit API, for checks built into a plugin or run across a series of models.

This snippet, for a Dynamo Python node, groups the warnings by description, from the most frequent to the rarest, with the elements involved.

# Dynamo Python node: list of the model's warnings
import clr
clr.AddReference("RevitServices")
from RevitServices.Persistence import DocumentManager

doc = DocumentManager.Instance.CurrentDBDocument
releve = {}
for avert in doc.GetWarnings():
    libelle = avert.GetDescriptionText()
    ids = [e.Value for e in avert.GetFailingElements()]  # Revit 2024+
    releve.setdefault(libelle, []).append(ids)

# One row per description: description, number of cases, IDs involved
OUT = sorted([[libelle, len(cas), cas] for libelle, cas in releve.items()],
             key=lambda ligne: -ligne[1])

Dated and archived at every issue, this list shows whether the model is improving or deteriorating; the IDs can be found with Select by ID on the Manage tab. The description depends on the Revit language: between teams working in different languages, the warning type identifier (GetFailureDefinitionId().Guid) serves as the key.

An automated check does not replace the review: it tells you that a beam has no material, not that it is in the wrong place. What it does do is make the checking repeatable and traceable.

The pre-issue quality checklist

Here is the checklist we suggest running at every issue, to be adapted to the project's BIM execution plan:

  1. Scope: recipient, use, stage and BIM execution plan requirements.
  2. Structural warnings dealt with, the list exported.
  3. The file audited, purged with judgement, compacted.
  4. Positioning: references pinned, coordinates matching, nothing stray far from the internal origin, no level or grid discrepancy left without a decision.
  5. Categories and structural usage of load-bearing elements.
  6. Materials, supports and joined geometry, level by level.
  7. Duplicates and interferences, partial overlaps included.
  8. Data: project information, names, required parameters, unique marks.
  9. Quantities, compared with the previous issue.
  10. Views, sheets and links in order.
  11. The copy and the exports, produced with the agreed setup, then reopened.
  12. The issue note written.

With a model about to be issued, would you like an outside eye on it, or a checklist tailored to your projects? Send us a copy of the model, if your contracts allow it, with the project's BIM execution plan or a few lines on how it will be used: that will be our starting point. Model quality control is part of our BIM management and coordination service.